Premium engineering • Moscow

Braukmann / Resideo water inlet node turnkey

A flagship page for the water inlet node: filtration, pressure reduction, backflow protection, backwash automation, drainage and service access for apartments, houses, pools, spa areas and commercial properties.

We build a neat water inlet node for the property: filtration, pressure reduction, backflow protection, backwash automation and service access work together as one clear system for stable water and easy operation.

selection by pressure, flow and inlet sizeturnkey installation and replacementdrainage, gauges and service accessdelivery within 5 working days
Braukmann / Resideo water inlet node turnkey

What is included in the inlet node

The assembly usually includes a filter, pressure reducer, check or backflow protection device, shut-off valves, gauges, a drain for backwashing and space for service access. The exact composition depends on the property and task.

How the node is selected

We check inlet diameter, pressure before and after reduction, design flow, consumption pattern, EN 1717 requirements, drain type, installation space in the plumbing cabinet or technical room, and service access.

What we do turnkey

Equipment selection, node layout, removal of the old assembly if required, installation, drain connection, reducer setting, reverse rinsing, leak test, commissioning and maintenance briefing.

Key elements of the Braukmann / Resideo node

Below are the main equipment groups used to build a neat and serviceable water inlet node.

Braukmann F76S / F78TS
inlet filtration

Braukmann F76S / F78TS

Sizes: F76S: 1/2″–2″; F78TS: DN65–DN100Configuration: reverse-rinsing fine filters

Reverse-rinsing filters for apartment, house, pool and commercial inlet nodes. F76S is commonly used on threaded domestic inlets, while F78TS covers larger flanged inlets and higher flow rates.

  • retain sand, rust and mechanical debris
  • support service backwash without full disassembly
  • selected by size, flow, installation space and drain arrangement
Price on requestDelivery within 5 working daysInstallation 1–2 days
Braukmann D06F / D15S
pressure reduction

Braukmann D06F / D15S

Sizes: D06F: DN15–DN50; D15S: DN50–DN150Configuration: pressure reducing valves with adjustable set point

Pressure reducing valves for stabilising downstream pressure. D06F is common for apartments and small houses, while D15S is used on larger inlet nodes and higher-capacity engineering assemblies.

  • reduce the risk of pressure surges and excessive water consumption
  • maintain stable pressure in internal lines
  • selected by inlet pressure, design flow and target set point
Price on requestDelivery within 5 working daysInstallation 1–2 days
Braukmann BA295S / BA300
backflow protection

Braukmann BA295S / BA300

Sizes: BA295S: 1/2″–2″; BA300: DN50–DN100Configuration: backflow preventer / RPZ assembly

Protective devices for separating potable and technical water according to the engineering task and EN 1717 requirements. BA295S is used on threaded nodes, BA300 on larger flanged lines.

  • protect against backflow, back pressure and back siphonage
  • important for make-up water, spa, pools and lines with technical water risk
  • require correct drainage, service access and a clear installation scheme
Price on requestDelivery within 5 working daysInstallation 1–2 days
Braukmann Z11AS / DDS76
backwash automation

Braukmann Z11AS / DDS76

Sizes: for compatible F76S, F78TS, HS10S and related assembliesConfiguration: backwash actuator and differential control

Automation for reverse rinsing of compatible filters and contamination control by differential pressure. Useful where a predictable service routine is required without constant manual intervention.

  • automates filter backwash by interval or signal
  • reduces dependence on manual maintenance
  • selected only after compatibility of the exact filter and node is confirmed
Price on requestDelivery within 5 working daysInstallation 1–2 days
Inlet node composition
assembly logic

Inlet node composition

Sizes: according to project and actual inlet sizeConfiguration: engineered water inlet assembly

A proper inlet node is not a single device but the correct sequence of components: filtration, pressure reduction, backflow protection, gauge control, drainage and service access. This complete assembly is what we install turnkey on site.

  • tailored for apartments, houses, pools, spa and commercial properties
  • takes into account cabinet or technical room space
  • includes backwash, drain, maintenance access and future replacement logic
Price on requestDelivery within 5 working daysInstallation 1–2 days

Where it is used

Apartment and penthouse

Compact cold/hot water inlet before the manifold, leak protection, mixers, water heater and household equipment.

Private house

Boiler room or technical room: protection of sanitary fixtures, boiler room, DHW system, pool and utility lines.

Pool and spa

Make-up water nodes, protection of heat exchangers, automation and water treatment equipment.

Commercial property

Offices, restaurants, technical zones and rooms where a stable inlet and a clear service routine are required.

Related page

Select a Braukmann / Resideo water inlet node

Send a photo of the existing assembly, inlet size, pressure and the task: new installation, replacement, pressure reduction, backflow protection, backwash automation or a complete inlet node. We will select the composition, models and installation sequence.

Hanwell Brauckmann filters have their own page with product lines and versions. Here the focus stays on the complete water inlet: what to place at the entry point, how to arrange it neatly and how to keep the system easy to service.