Manifolds and correct hydraulics
Stable operation of points, balance, service access.
Recirculation and comfort
Fast hot-water delivery, units and valves matched to the operating mode.
Leak protection
Sensors, shut-off units and logic to minimize risks to the finishes.
How installation proceeds
We work to agreed runs and units, considering architecture, finishes and service access.
1) Preparation
- Coordination of runs and points.
- Specification of materials and units.
- Protection of finishes and work area.
2) Installation and assembly of units
- Manifold groups, filtration, pressure reduction.
- Recirculation circuits.
- Shut-off valves and serviceability.
3) Testing
- Pressure testing and leak-tightness control.
- Check of leak-protection logic.
- Operating mode tuning.
4) Handover
- As-built recording of units and runs.
- Operating instructions.
- Ready for service.