Survey of electrical systems, switchboards and cable lines
We check incoming supply, distribution boards, breakers, RCD/differential protection, grounding, equipotential bonding, loads, cable lines, low-current systems and readiness for safe operation.
The goal is to identify risks before failure: overheating, wrong ratings, weak connections, overload, lack of labels and mistakes after rework.

Checking incoming supply, breakers, RCDs, differential breakers, selectivity, labels and layout.
Assessment of groups, conductor sizes, routes, connections, penetrations, heating and power reserve.
Checking low-current lines, grounding, equipotential bonding and high-humidity zones.
What the survey includes
We check not only visible components, but also the hidden system logic: routes, loads, access, safety, finish-related risks and future operation.
- incoming supply, line grouping and labels
- breakers, RCDs and differential protection
- selectivity and load matching
- assembly quality and service access
- conductor sizes and actual loads
- connections, terminals and penetrations
- overheating and overload signs
- reserve for future upgrades
- grounding and equipotential bonding
- protection for wet zones, SPA and pools
- emergency shutdown of critical groups
- readiness for checks and operation
- low-current, internet and CCTV
- automation and smart home
- fire alarm and notification if required
- UPS, generator, ATS and redundancy
Instrument checks and records
The survey format is selected for the property. Where needed, we use video inspection, thermal imaging, measurements, photo records and analysis of existing schemes.
When needed, we record contact heating, overloaded joints and switchboard anomalies.
We check network parameters, protection, circuits and actual condition of accessible lines.
We assess layout, labels, assembly neatness and maintenance safety.
We separate dangerous defects, planned upgrades and tasks for electrical installation.
Where a survey is especially important
This diagnosis is needed where an engineering error is expensive: finishes, operation, deadlines and the project reputation.
Checking hidden engineering risks before finishing, purchase, renovation or rework.
Diagnostics of technical rooms, long routes, redundancy and interaction between systems.
Checking loads, water, sewerage, ventilation, electrical systems and downtime risks.
Special attention to humidity, condensation, safety, drainage and service access.
Checking comfort, noise, control nodes, hidden defects and readiness for operation.
Assessment of safety, marking, access, redundancy and clear operation.
How the survey is carried out
We follow a clear sequence: record the initial data, check the system, separate urgent risks from planned work and give the owner a clear picture.
We clarify the property type, symptoms, renovation stage, access to nodes, documents and finish-related limits.
We check accessible areas, technical rooms, shafts, cabinets, routes, equipment and actual assembly.
When required, we use a camera, thermal imager, measurements, test starts and operating-mode checks.
We separate visible symptoms from the cause: routing, equipment selection, installation, automation or operation.
We divide urgent risks, planned corrections and tasks that can be done during the next renovation stage.
We provide conclusions, photos, a defect list, recommendations and a clear structure for further work.
What the client receives
The survey result is not a set of general phrases, but a clear list of risks, priorities and technical actions.
Actual condition, identified defects, risks, causes and priorities for correction.
What to fix immediately, what to schedule, what to check further and which nodes to monitor.
Survey materials that can be shared with the owner, manager, designer or contractor.
Solutions for upgrade, repair, installation, access, automation and future maintenance.
Survey of electrical systems, switchboards and cable lines
Tell us the property type, system and issue. We will suggest the survey format and the checks required.