For the layout
Runs and grilles without conflicts with architecture and finishes.
Acoustics
Noise reduction and vibration isolation per the room's tasks.
Operating modes
We select and assemble units so the system works predictably.
Installation and preparation for start-up
Assembly of runs, units, sealing, preparation for flow balancing.
Assembly
- Ducts and hangers.
- Units, valves, silencers.
- Penetrations and sealing.
Quality control
- Check of runs.
- Preparation for commissioning.
- As-built recording of concealed works.